Loading...
Exploration & Mine Engineering 2019-07-31T07:21:17+00:00

EXPLORATION & GEOLOGICAL ENGINEERING

Assisting Mine Owner, Investor, or Lender to asses the coal & mineral resources potential within mining concession by developing a proper and efficient Exploration Management Program and establishing a reliable exploration & geological database that follow both JORC and KCMI standards. We use proven mining software to develop geological model and could be easily applied on mining engineering.

MINING ENGINEERING

We estimate reserves based on reliable database and develop mine planning and mine scheduling both short term and long term planning. Reserves optimization and your view of profit are our concern by considering good mining practices and environmental impact.

We assist investor or lender to periodically audit and calculate reserve based on existing mining operation and exploration progress.

JORC REPORTING

What is the JORC Code?

JORC Code is a professional code of Practice that sets minimum standarts for Public Reporting of Minerals Exploration Results, Mineral Resources, and Ore Reserves.

KCMI REPORTING

What is KCMI Code?

  • The code is formulated with a view to establish minimum standards for reporting exploration results, mineral resources and ore reserves accordance with international standards.
  • The code is largely adopted from Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves – The JORC Code – 2004 Edition”
  • This code applied to every “Competent Person Indonesia” members of the PERHAPI and IAGI and proposed for adoption and regulations listed in the Indonesia Stock Exhcange.

Area Of Services

  • Reconnaissance Study

  • Geological Review & Mapping

  • Drilling Supervision

  • Exploration & Geological
    Database

  • Geological Modeling

  • Resources Estimation

  • Review & Audit of Exploration
    Program

  • Permit & Legal Investigation

  • Reserve Estimation

  • Reserve Assesment &
    Review

  • Mine Planning &
    Schedulling

  • Mine Operation Audit

  • Project Work

ENVIRONMENTAL PLANNING & MONITORING

PRODUCTION MONITORING

LEGAL REVIEW (MINING)

EXPLORATION & GEOLOGICAL ENGINEERING

GEOTECHNICAL INVESTIGATION

MINING ENGINEERING

GRAPHIC DESIGNG & IT SERVICES (by Sister Company)

HYDROLOGY & HYDROGEOLOGY STUDY

FORENSIC ENGINEERING SERVICES

CIVIL & INFRASTRUCTURE ENGINEERING

MINE CLOSURE & RECLAMATION

CAMP & LOGISTIC SUPPORT (by Sister Company)

 

Portfolio of Exploration & Mine Engineering

 

 

  • Site Inspection – Batulicin Coal Project, South Kalimantan – awarded by SWE Singapore.
  • GeologicalModeling, Coal Resources Estimation, and Mine Planning of Bintuni Project, Papua – awarded by PT. Horna Inti Mandiri (HIM).
  • Exploration & Geology Data Review, Geological Modeling, Coal Resources & Reserves Estimation, and Mine Planning of SPH Project in Kutai Kartanegara, East Kalimantan – awarded by PT. Sumber Permata Hitam (SPH).
  • Geological Modeling and Mine Planning of BBE North Block Project in Kutai Karta negara , East Kalimantan – awarded by PT Bukit Baiduri Enterprise (BBE).
  • Geological Review of Coal Deposit Prospect in Kalimantan – awarded by Darma Henwa Services (DHS).
  • Geological Review of PT. Buana Eltra and PT. Mitra Bisnis Harvest, Baturaja South Sumatra – awarded by PT. Cakrawala Sejahtera Sejati (CSS).
  • Mine Scheduling of Triaryani Project in Musi Rawas South Sumatra – awarded by PT. Triaryani.
  • Mine Scheduling Project in Paser, East Kalimantan – awarded by PT. Tunas Muda Jaya (TMJ).
  • Site Investigation of Tanah Bumbu Project – awarded by PT. Tanaco Utama.
  • Geological Review of PT. Bintan Mineral Resources, Muaradua, South Sumatra – awarded by PT. Cakrawala Sejahtera Sejati (CSS).
  • Exploration Program (Drilling & Survey), Geological Data Review, Preliminary Geological Model, Coal Resources Estimation, and Mine Planning of IUP CV. Mulia Abadi, Sanga-Sanga, East Kalimantan – awarded by PT. Gasim Pradana Selaras (GPS).
  • Technical Review of NTC Project in Jambi – awarded by PT. Nusantara Thermal Coal (NTC) & CIMB Niaga.
  • Monthly Mine Panning (1st year), Annual Mine Planning until Life of Mine (LOM) of Triaryani Mine Project in Musi Rawas, South Sumatra – awarded by PT. Triaryani.
  • Aerial Survey and Exploration Data Review of Paser Project, East Kalimantan – awarded by PT. Jakarta Capital.
  • Geological Model Update and Mine Planning Services of Bintuni Project, Papua – awarded by PT. Horna Inti Mandiri (HIM).
  • Exploration Management , Geotechnical & Hydrogeological Investigation, and JORC Reporting in Kutai Karta negara , East Kalimantan – awarded by PT. Sumber Permata Hitam (SPH).

 

 

  • Geological Model Conversion and Life of Mine Plan (LOM) of Bengkulu Mine Project – awarded by PT. Titan Wijaya (TW).
  • Strategic Mine Plan of Bengalon Project Pit B in Kutai Timur, East Kalimantan – awarded by PT. Bokormas Wahana Makmur.
  • Geological Mapping of Block 9 PT. Triaryani in Musi Rawas, South Sumatra – awarded by PT. Triaryani.
  • Geological Modeling and Mine Planning Services of FBS Project in Kutai Kartanegara, East Kalimantan – awarded by PT. Fajar Bumi Sakti (FBS).
  • Practical Training of Geological Modeling and Mine Planning in Kutai Kartanegara, East Kalimantan – awarded by PT. Titan Wijaya (TW).
  • Geological Mapping Program in NAD – awared by PT. Alam Aceh Resources (AAR).
  • Review and Advisory Services, and Feasibility Study Revision of PT. KBK in Central Kalimantan – awarded by PT. Kasongan Bumi Kencana (KBK).
  • Geological, Mine Engineering, Mentoring, and Monitoring (3 months duration) of PT. Loa Haur Energi in Kutai Kartanegara East Kalimantan – awarded by PT Loa Haur Energi (LHE).
  • Technical Review of Insani Bara Perkasa Mine Project in Kalimantan – awarded by PT. Loa Haur Energi (LHE).
  • Exploration Management Program of Block Betung in Musi Rawas, South Sumatra – awarded by PT. Triaryani.
  • Technical Review of BAS Coal Mine Project in South Sumtra – awarded by PT. Titan Mining Energy (TME) and CIMB Niaga.
  • Practical Training of Geological Modeling and Mine Planing in Musi Rawas, South Sumatra – awarded by PT. Triaryani.
  • Capex & Opex Review of Coal Hauling Road Upgrading and Road Maintenance Phase 1 (Servo Hauling Road Project) in South Sumatra – awarded by PT. Titan Mining Energy (TME) and CIMB Niaga.
  • Additional Work of Exploration Management Program of Betung Block, Triaryani Coal Project in Musi Rawas, South SUmatra – awarded by PT. Triaryani.
  • Capex Review and Construction Progress Monitoring of MCM Project in Muara Barong, East Kalimantan – awarded by PT. Madani Citra Mandiri (MCM) and CIMB Niaga.
  • Conceptual Life of Mine Planning of PT. Triaryani in Musi Rawas, South Sumatra – awarded by PT. Triaryani.
  • Project Review of Baturona Coal Mne Project in South Sumatra – awarded by PT. Baturona Adimulya, BII, CIMB Niaga and ICBC. Technical Review of Titan Wijaya Project in Bengkulu – awarded by Titan Mining Energy (TME) and CIMB Niaga.